Construction of My 700 sq. ft.

Accessory Dwelling Unit

Construction began in late May 2018 and I received the certificate of completion in late January 2019.

Keep clicking on "Show More" at the bottom to see the entire tour.

Questions about the process? Click here.

Day 1: Groundbreaking
Day 1: Groundbreaking
press to zoom
Preparing 39' x 19' foundation
Preparing 39' x 19' foundation
press to zoom
Perfection
Perfection
press to zoom
Concrete trucks arrive
Concrete trucks arrive
press to zoom
Let it pour
Let it pour
press to zoom
Running concrete pipe
Running concrete pipe
press to zoom
Smoothing it out
Smoothing it out
press to zoom
Installing foundation insulation
Installing foundation insulation
press to zoom
Gotta have a honey bucket
Gotta have a honey bucket
press to zoom
Sketching out the framing
Sketching out the framing
press to zoom
First section to go up
First section to go up
press to zoom
South wall is up
South wall is up
press to zoom
More walls up
More walls up
press to zoom
Putting the 39 foot beam in place
Putting the 39 foot beam in place
press to zoom
Cranking the beam in place
Cranking the beam in place
press to zoom
Looking quite spacious
Looking quite spacious
press to zoom
Office windows
Office windows
press to zoom
Kitchen windows
Kitchen windows
press to zoom
Installing a roof
Installing a roof
press to zoom
Takes lots of lumber
Takes lots of lumber
press to zoom
Installing roof and 2 skylights
Installing roof and 2 skylights
press to zoom
Roofing begins
Roofing begins
press to zoom
Will they ever install the toilet?
Will they ever install the toilet?
press to zoom
Interior view
Interior view
press to zoom
Future living room
Future living room
press to zoom
14 foot ceiling
14 foot ceiling
press to zoom
West side
West side
press to zoom
Future bathroom
Future bathroom
press to zoom
Storage loft above bedroom
Storage loft above bedroom
press to zoom
Kitchen Windows
Kitchen Windows
press to zoom